I did mine in this order..
Fill and stabilize fuel
Run on muffs for about 10 minutes
Oil and filter change
Fog engine and shut her down
Drain manifolds and block (probe openings)
Pull hoses from impellor housing and drain
Pull water pump hose loose and drain
raise and lower bow
Spin engine couple times to evacuate water from pumps
Re-connect impeller and water pump hoses and install drain plugs
Release bow and stern strap tension
Grease prop shaft
Remove battery, place moth balls, shrinkwrap boat
Low unit oil swap & Impellor change to be done in the Spring.
_________________
2008 Horizon 180 Volvo Penta 3.0
