well i had about 15 min last night to get a little work done. All the screw holes pre drilled and screws in place. Every little bit helps. I will glue up tonight.
the sub box is marked with a scrap of wood.. it will be 2.18ft3 internal when done. and drop to around the mid 1s after basket loss. this should be perfection. so 2x 12s diagonal placement in the cockpit firing at each other. This should be nice upgrade from the 10" bazooka i had in the rear. PLUS this will look much cleaner and more factory correct.
the screws are a torques head small head screw that is 1.5" long and will do a great job of holding these walls together with glue then glass. I have had great success with these small screw heads in the past for large 1/2" router edges.
Assembly to happen tonight. Routing saturday along with the lid and base lips for a nice toe kick recess that double as the gutters for the water directing to the drains. I also plan to do the front hatch under side re enforcement's and the fuel hatch reinforcements. This should get me to have all of the pieces parts MINUS the rear hatch and back rest done.. WAITING ON THE HEAT FOR GLASS.


_________________
Not Penny's Boat
1993 190 Horizon 5.0L EFI http://www.smwebhead.com/phpBB3/viewtopic.php?f=3&t=111361977 14' CMF Skiff SOLD
2015 Emotion Stealth Angler 11